Complete kitchen remodels in the Central Valley

Complete Kitchen Renovations — Every System. Every Surface. Done Once.

A complete kitchen renovation touches plumbing, electrical, structural work, and every finish. We coordinate all of it under one license, one scope, and one standard.

CA License #1066959

One complete scope

What’s Included in a Complete Renovation

Demo & Haul-Away

We protect adjacent areas, remove the existing kitchen, and haul debris away as part of a managed start-to-finish scope.

Structural & Framing

When the design calls for it, we handle framing changes and structural coordination before finishes begin.

Plumbing & Electrical

Water, drain, gas, lighting, outlets, and dedicated appliance circuits are planned and coordinated with the new kitchen.

Cabinets & Countertops

Cabinet installation, countertop templating, fabrication coordination, and fit are sequenced around the finished layout.

Flooring & Backsplash

Flooring and backsplash work are installed in the right order for clean transitions and durable surfaces.

Fixtures & Appliances

We coordinate fixture and appliance installation so the completed kitchen is ready to use, not left half-finished.

Clear starting point

Complete kitchen renovations start at $35,000

Your final investment follows the work required to rebuild the room—not a vague allowance with surprises later.

What affects price

  • Kitchen size and existing conditions
  • Layout changes and structural work
  • Cabinet, countertop, tile, and fixture selections
  • Appliance package and utility requirements

What’s always included

  • Detailed scope and coordinated trade sequencing
  • Site protection, demolition, and debris haul-away
  • Project management and quality checks through completion

What’s optional

  • Premium appliance packages
  • Specialty finishes and custom millwork
  • Adjacent-room work outside the kitchen scope

One accountable team

The Coordination Problem

Full kitchen renovations fail when several contractors manage separate pieces without a shared plan. Scheduling conflicts stall progress, scope gaps become change orders, and no one owns the handoff between trades. ParagonCA manages the work under one licensed scope, so plumbing, electrical, framing, cabinetry, surfaces, and final installation move in the sequence the room requires.

  • One schedule for every trade
  • One scope that identifies handoffs before work begins
  • One accountable team from demolition through final details

Complete kitchen work

Built around the whole room

Completed custom kitchen renovation in Modesto
Modesto kitchen renovation
Completed kitchen renovation with custom finishes in Sacramento
Sacramento kitchen renovation
Completed full kitchen remodel with custom cabinetry
Full kitchen remodel
Completed whole-home renovation project in Turlock
Turlock whole-home project

From homeowners

Complete renovation, coordinated start to finish

They kept the entire kitchen project moving—from demolition through the final details—without leaving us to coordinate separate crews.

Central Valley homeowner

Modesto, CA

The scope was clear, the work was organized, and the finished kitchen feels like it was built as one room, not a collection of separate jobs.

Central Valley homeowner

Turlock, CA

We appreciated having one team accountable for the layout, utilities, cabinets, counters, and installation.

Central Valley homeowner

Tracy, CA

Central Valley service area

Complete kitchen renovations across the Central Valley

We serve homeowners throughout the Central Valley with licensed, coordinated kitchen renovation work.

  • Modesto
  • Turlock
  • Tracy
  • Stockton
  • Manteca
  • Lathrop
  • Ripon
  • Oakdale
  • Riverbank
  • Patterson
  • Ceres
  • Salida
  • Hughson
  • Escalon
  • Lodi

Complete kitchen renovation FAQs

Questions homeowners ask before a full kitchen remodel

How much does a complete kitchen renovation cost?

Complete kitchen renovations with ParagonCA start at $35,000. Final pricing depends on the kitchen’s size, layout changes, material selections, appliance package, and any structural or utility work required.

How long does a complete kitchen renovation take?

The timeline depends on design decisions, permits, inspections, material lead times, and the scope of structural or utility work. We build the schedule around the actual sequence of the work before construction begins.

Do I need permits for a full kitchen remodel?

Permits are often required when the project includes structural, plumbing, electrical, or gas work. We identify permit needs during planning and coordinate the work accordingly.

Can I live at home without a kitchen during the renovation?

Many homeowners remain in the home, but the kitchen will be unavailable for part of the project. We discuss site access, dust control, temporary meal planning, and the expected downtime before work starts.

Do you install appliances?

We coordinate appliance installation as part of the complete kitchen scope, including the utility preparation and sequencing needed for a proper final installation.

How long do countertops take after cabinets are installed?

Countertops are typically templated after cabinets are set and then fabricated before installation. The exact lead time depends on the material, fabricator schedule, and project details.

What is not included in a complete kitchen renovation?

Items outside the agreed kitchen scope—such as unrelated room work, specialty upgrades, or owner-selected products beyond the allowance or selection plan—are identified separately before they are added.

What warranty do you provide?

Warranty coverage is explained in your project agreement and applies to the work performed by ParagonCA. Product warranties from manufacturers are provided separately where applicable.

Schedule Your Free Complete Kitchen Renovation Consultation

Bring us the whole-room problem. We’ll help you define a licensed, coordinated scope for the kitchen you want to build.